Installation Manual
H3C SecPath F100-C-EI Firewall
Chapter 3 Installing the Firewall
3-10
3.6 Verifying Installation
Each time before you power on the firewall during installation,
verify that:
z Enough room has been left around the firewall chassis for
adequate heat dissipation and the workbench is stable.
z The power source fits the firewall.
z The PGND wire of the firewall is correctly connected.
z The firewall has been correctly connected to other devices,
such as a console terminal.
Caution:
Installation verification is extremely important, because the normal
functioning of the firewall relies on its firm installation, proper
grounding, and correct power feed.